/ Dual-Plant Manufacturing

Industrial greenhouse manufacturing at global scale

Operating advanced production facilities across Ningbo and Dong Nai, we engineer hot-dip galvanized steel frames that insulate supply chains from trade disruptions while maintaining strict structural load tolerances.

OEM Execution

The four-stage production workflow

01
02
03
04

CAD Verification

Precision Fabrication

Hot-Dip Galvanizing

Container-Ready Packing

Engineering review of load specifications and proprietary extrusion drawings, delivering production-ready blueprints within 48 hours.

Automated tube bending, CNC laser cutting, and punch press operations maintaining synchronized tolerances across both facilities.

Immersion in molten zinc baths ensuring complete interior and exterior corrosion resistance for extended commercial service life.

Optimized bundling and crating protocols maximizing steel tonnage per 40ft high-cube container shipment.

Plant Infrastructure

Advanced fabrication machinery and robotics

Welding

Robotic welding cells

Multi-axis robotic welding stations deliver uniform, penetration-verified structural joints capable of withstanding heavy regional wind and snow loads.

Corrosion Control

Continuous galvanizing tanks

High-capacity zinc immersion baths apply consistent protective metallurgy across all custom profile extrusions and tubular components.

Punching & Bending

CNC press brakes and extruders

High-tonnage automated tube mills and CNC punch presses form complex architectural geometries with zero tolerance drift.

Verify our production standards and compliance paperwork

Access comprehensive facility blueprints, ISO certifications, and load test reports for your next commercial procurement cycle.